Merebank Sai Centre Ashram Building
2012 - 2013

OPTION 1: OFFER BY DHANPAL NAIDOO
VIEW TO THE MAZZANINE FLOOR FROM THE ADJOURNING OFFICE
TOP OPEN AREA TO BE SLABBED

1st Site Inspection
Tuesday 4th Dec 2012 - 3.30pm
BRIEFING BY DHANPAL NAIDOO

SITE BEFORE COMMENCING
BREAKING UP ON SIDE WALLS

BREAKING UP THE WALLS IN THE BASEMENT
SECTION OF THE HALL

WALLS ARE DEMOLISHED

OUTSIDE VIEW OF THE ASHRAM

INTERIOR WALLS BRICKED UP &
THE VACANT SECTION TO BE SLABBED

BUILDING OF TOILETS

Digging of Trench
(Pipeline for Toilets)

Pipelines Fitted

Pipelines
Being Laid

Toilets Built

Males
Females →

Door Frame

Kitchen